Data collection is usually the longest stage of an environmental product declaration (EPD) project, and the one most within your control. The quality of your life cycle inventory (LCI) data sets the accuracy of the life cycle assessment (LCA), the effort your verifier spends, and how far your timeline stretches. This guide covers the EPD data requirements, what to collect in what order, and who in your organization usually holds it. It expands on step 4 of How to Get an EPD: Step-by-Step.

In short: to get an EPD, you need 12 months of operating data for one facility, covering production output, raw materials and packaging, energy, transport, and waste and emissions. Your LCA partner combines this primary data with background databases to calculate impacts such as global warming potential (GWP), following the product category rules (PCR) for your product.

1. Fix the scope before you collect anything

Every number you gather must describe the same thing, so agree three boundaries with your LCA partner first. Also confirm the system boundary: most EPDs are at least cradle-to-gate (modules A1–A3), and some PCRs require later life cycle stages too. If you haven’t chosen a program operator yet, do that before collecting, since it determines which PCR you’ll work against.

  • Product(s): one product, or a group of similar products declared together. Grouping saves effort but needs data that lets the model show how much the products differ. If an industry-average EPD already covers your category, you may not need product-specific data at all.
  • Facility: the specific plant(s) the EPD will cover. Data from other sites can’t be swapped in.
  • Reference period: most PCRs expect a continuous 12-month period of recent operating data, usually your last full calendar or fiscal year. Check the exact rule in your PCR.

Most rework in data collection traces back to one of these shifting midway, for example a second product added after the energy data was already allocated.

2. Production output

Start here, because every other input gets divided by it. For the reference period, gather:

  • Total output of the declared product, in the PCR’s declared or functional unit (m², tonnes, units)
  • Total output of everything else made at the facility, so shared inputs can be allocated
  • Yield and scrap rates, including what happens to scrap (reused in-house, sold, landfilled)

If the facility makes many products, also note how you’d fairly split shared inputs: by mass, by machine hours, or by area. Your LCA partner will confirm which method the PCR allows.

3. Materials and packaging

For most products, raw materials (module A1) drive the largest share of embodied carbon and other impacts, so this list deserves the most care.

  • Bill of materials: every input by mass per declared unit, including adhesives, coatings and additives. Small inputs can still matter.
  • Material specifics: grade, alloy, resin type, and recycled or bio-based content, backed by supplier documentation where possible.
  • Supplier and origin: who supplies each material and from where. This feeds the transport step and the choice of background dataset.
  • Supplier EPDs: if a key supplier has its own EPD, ask for it or look it up in the EPD databases. Supplier-specific data usually beats a generic database value.
  • Packaging: materials and mass for product packaging and pallets, plus how much is reused.

Purchasing records for the reference period are the easiest starting point. Reconcile them against production output to catch inventory swings. For material issues specific to your sector, see your page under Industries.

4. Energy and utilities

Pull 12 months of utility bills for the facility. They are usually the most reliable data you have.

  • Electricity: total kWh, plus your supplier or utility. Grid electricity impacts vary a lot by region.
  • Renewable electricity: on-site generation, green tariffs, PPAs or certificates, with the contracts that prove them. Whether these count depends on the PCR, your program operator and regional requirements.
  • Fuels: natural gas, propane, diesel for forklifts, and any other fuel burned on site.
  • Water: intake volume and, where relevant, discharge.

Few plants meter energy by product line. A facility total plus a sensible allocation is normal and accepted; sub-metering is nice to have, not a prerequisite.

5. Transport

Transport is often a smaller share of impacts, but verifiers still expect it to be documented.

  • Inbound: distance and mode (truck, rail, ship) from each main supplier to your plant. Supplier addresses plus a mapping tool are usually enough.
  • Outbound: typical distance and mode to customers or distribution centers, if the PCR includes distribution (module A4 under EN 15804 and ISO 21930).

For many small suppliers, a weighted average distance is fine. Spend your effort on the heaviest materials and longest routes.

6. Waste and direct emissions

  • Waste: each waste stream by mass (scrap, packaging waste, sludge, hazardous waste) and how it’s treated: recycled, incinerated or landfilled. Waste hauler reports often have this.
  • Direct emissions: process emissions not covered by fuel use, such as VOCs from coatings or CO₂ from chemical reactions. Environmental permits and regulatory reports are the usual source.
  • End of life: if your PCR covers end-of-life modules (see How EPDs Work), note anything you know about how the product is disposed of or recycled, or any take-back program.

7. Know who holds what

The data is rarely missing; it’s spread across departments. Name one internal coordinator and map each category to an owner before kickoff.

Data category Usually held by Typical source
Production output, scrap Operations / plant manager ERP or MES reports
Bill of materials, specs Engineering / R&D Product specs, BOM exports
Materials purchased, suppliers Procurement Purchase orders, supplier records
Energy and water Facilities / finance Utility bills
Inbound and outbound transport Logistics Freight invoices, shipping records
Waste and emissions EHS Hauler reports, permits

A single shared tracker with each item, owner and status keeps requests from bouncing around by email. Brief owners early on why you’re asking: data arrives faster when people know the EPD has a customer behind it. If no one internally has the capacity, many consultants will run collection for you; see DIY vs. Outsourced and Choosing an LCA Consultant or Software Platform.

Primary vs. secondary EPD data: where each counts

You don’t need measured data for everything. Primary data (also called specific or foreground data) is what you measure from your own operations; secondary data (generic or background data) comes from LCA databases such as ecoinvent and industry averages. PCRs generally require primary data for processes you control (your own facility’s energy, materials and output) and allow secondary data for upstream processes you don’t.

Prioritize primary data for your biggest impact drivers. Fill small or hard-to-reach gaps with documented estimates rather than stalling the project. Your verifier will check that assumptions are stated, not that every number was metered; see EPD Verification for what they review. From LCA to EPD covers data types in more depth, and unfamiliar terms are in the Glossary.

Frequently asked questions

What data do I need for an EPD?

Twelve months of facility data covering production output, bill of materials, energy and utilities, transport, and waste and emissions. The exact EPD data requirements are set by the PCR for your product category.

What is life cycle inventory (LCI) data?

LCI data is the list of every input and output of your product's life cycle: materials, energy, water, emissions and waste. It's the raw material of the LCA that sits behind every EPD.

What should I collect first?

Production output and utility bills for your reference period. They're easy to find, and almost every other input is calculated against them.

We don't meter energy by product line. Is that a problem?

No. Facility-level data allocated across products is standard practice. Document the allocation method and keep it consistent.

How far back should the data go?

Typically one continuous, recent 12-month period. Check your PCR for its specific rule on data age and averaging.

Do I need data from my suppliers?

Not necessarily. Generic database values can cover most upstream materials. Supplier-specific data or supplier EPDs are worth requesting for your highest-impact inputs, especially if they're lower-carbon than average.

How long does data collection take?

It depends mostly on how organized your records are and how many products you're declaring. See How Long Does It Take for typical ranges, and What Does an EPD Cost? for how data readiness affects price.